Mayor Jim Ross | City of Arlington Texas website
Mayor Jim Ross | City of Arlington Texas website
The Texas Department of Transportation's work continues on the $233 million Interstate 30/SH 360 Interchange Project in Arlington. TxDOT announced the direct connector ramp from I-30 eastbound mainlanes to SH 360 northbound lanes was placed into service May 6. The new westbound I-30 interchange ramp to SH 360 and the southbound SH 360 interchange ramp to eastbound I-30 opened in March.
Closures listed below are subject to changes due to weather and schedule. For more information and new project photos, please visit the Keep 30360 Moving website.
Special Note: The northbound SH 360 exit to Six Flags Drive is permanently closed. Motorists should follow the detour and take the Division Street exit to access Six Flags Drive. A new exit ramp to Six Flags Drive is under construction.
New or updated items are indicated in bold.
The City of Arlington has partnered with Waze to give drivers the best experience possible to get around town. Drivers can download Waze for free at www.waze.com/get for iOS and Android and see real-time traffic, find optimal routes, avoid road closures and more.
Click here to learn more about the I-30/SH 360 Interchange Project.
I-30 Mainlanes and Ramps
I-30 Westbound Mainlanes
- Daily, Aug. 26-29, 9 a.m.-3 p.m.: The right, outside lane of I-30 westbound mainlanes between Six Flags Dr and Ballpark Way will be closed for general construction work.
Anticipated, Fall 2023: The I-30 westbound mainlanes will switch to its permanent location between Great Southwest Pkwy and Ballpark Way.
- Anticipated, Sept. 10, 12 a.m.-6 a.m.: I-30 eastbound mainlanes will switch to their permanent location between Ballpark Way and Great Southwest Pkwy. WATCH FOR NEW TRAFFIC PATTERN.
- Effective Aug. 9, 2020: This direct connector ramp from I-30 eastbound mainlanes to SH 360 southbound mainlanes is now in service.
- Effective, June 27, 2023: The 2nd exit lane to access the direct connector was placed into service.
- Effective May 6, 2023: This direct connector ramp from I-30 eastbound mainlanes to SH 360 northbound mainlanes was placed into service.
- PERMANENT: Effective June 19, 2021: The I-30 eastbound exit to SH 360/Six Flags Drive is detoured to exit for the current eastbound exit to Six Flags Drive.
- Daily, Aug. 26-29, 9 a.m. - 3 p.m. - The I-30 westbound entrance from SH 360/Six Flags Dr will be closed for general construction work. Traffic will be detoured to the next entrance ramp from AT&T Way/Baird Farm Rd.
- Effective Sept. 2, 2022: The I-30 westbound entrance ramp from SH 360/Six Flags Drive was returned to service.
- Effective Aug. 26, 2020: A new traffic signal is active at the intersection with the new, permanent I-30 westbound exit ramp to SH 360/Six Flags Dr. Traffic passes through this signalized intersection to access the westbound I-30 entrance ramp. BE AWARE OF NEW TRAFFIC PATTERN.
- PERMANENT: The eastbound I-30 entrance ramp available from the Convention Center Drive/Copeland Road intersection will be closed permanently. Traffic will continue to have access to the ramp to northbound Ballpark Way.
- PERMANENT: The eastbound I-30 entrance ramp from northbound Ballpark Way will be closed permanently for the construction of a new northbound Ballpark Way connector to eastbound Copeland Road
- Effective Oct. 1, 2022: This direct connector ramp from I-30 westbound mainlanes to SH 360 northbound mainlanes has been placed into service.
- Effective, March 21, 2023: The direct connector ramp from I-30 westbound to SH 360 southbound mainlanes is anticipated to be placed into service.
- Effective Aug. 26, 2020: A new I-30 westbound exit ramp to SH 360/Six Flags Dr is open to traffic, replacing the previous loop exit ramp. Traffic makes a left turn through a signalized intersection to continue across I-30 towards SH 360. BE AWARE OF NEW TRAFFIC PATTERN.
- PERMANENT: The eastbound I-30 entrance ramp available from the Convention Center Drive/Copeland Road intersection is closed permanently. Traffic will continue to have access to the ramp to northbound Ballpark Way.
- PERMANENT: The eastbound I-30 entrance ramp from northbound Ballpark Way is closed permanently. This ramp now serves as an uninterrupted ramp to eastbound Copeland Road.
- Effective Aug. 26, 2020: A new I-30 westbound exit ramp to SH 360/Six Flags Dr is open to traffic, replacing the previous loop exit ramp. Traffic makes a left turn through a signalized intersection to continue across I-30 towards SH 360. BE AWARE OF NEW TRAFFIC PATTERN.
- Effective Feb. 11, 2022: The I-30 westbound frontage road between Six Flags Drive and Ballpark Way was opened.
- Oct 15, 2022: The I-30 eastbound frontage road between Copeland Rd and Six Flags Drive was placed into service.
- Anticipated, Fall 2023: The I-30 westbound exit to AT&T Way/Baird Farm Rd will be closed for traffic safety barrier reconstruction. Upon completion of the work, access to exit will only be from the managed lane when returned to service.
- Anticipated, Fall 2023: The I-30 eastbound entrance from AT&T Way/Baird Farm Rd will be closed for traffic safety barrier reconstruction. Upon completion of the work, access to enter will closed until the managed lane is returned to service.
Westbound I-30 HOV lane west of SH 161
- The westbound HOV lane west of SH 161 will be closed. TEXpress lane traffic will be directed into the I-30 westbound general main lanes west of SH 161.
- The eastbound HOV lane access near Center Street and lane through Tarrant County will be closed. TEXpress lane traffic will enter at SH 161.
SH 360 Southbound Mainlanes
- Continuous, 8 p.m. Sept. 15 through 8 a.m. Sept 17, The SH 360 southbound mainlanes will be closed between Ave J and SH 180/Division Street for pavement maintenance. Traffic will be directed to exit at Ave J to the SH 360 southbound frontage road to the entrance ramp from SH 180/Division Street. EXPECT DELAYS. SEEK ALTERNATE ROUTES.
- PERMANENT: The SH 360 southbound entrance from Brown Boulevard/Avenue K is PERMANENTLY CLOSED. Traffic is detoured along the SH 360 southbound frontage road to enter from the Six Flags Drive entrance ramp. A new entrance ramp will be constructed between Lamar Boulevard and Six Flags Drive.
- The SH 360 northbound exit to Lamar Boulevard is closed for reconstruction. Traffic is directed to exit Six Flags Drive and continue on the northbound frontage road to Lamar Boulevard.
- Effective May 3: The new, SH 360 northbound entrance from Ave J was placed into service.
- PERMANENT: The SH 360 northbound entrance from Lamar Boulevard is PERMANENTLY CLOSED. Traffic will be detoured along the SH 360 northbound frontage road to enter from the Brown Blvd/Ave K entrance ramp. A new permanent entrance ramp will be constructed between Ave J and Brown Blvd/Ave K.
- A new SH 360 southbound exit ramp to Avenue J/Lamar Boulevard is open to traffic.
- Effective Aug 1, 2020: This direct connector ramp is open to traffic.
- March 17, 2023: The direct connector ramp from SH 360 southbound to I-30 eastbound was placed into service.
- PERMANENT: The SH 360 southbound exit to Lamar Boulevard is PERMANENTLY CLOSED. Traffic is detoured to exit to Brown Boulevard/Avenue K and follow the SH 360 southbound frontage road to Lamar Boulevard. A new exit ramp will be constructed to Avenue J/Lamar Boulevard/Six Flags Drive.
- The new, permanent SH 360 southbound entrance from Lamar Boulevard is open for service.
- Effective, May 1: The SH 360 northbound exit to Lamar Boulevard is anticipated to be placed into service.
- Through Spring 2023: The SH 360 northbound exit to Lamar Boulevard is closed for reconstruction. Traffic is directed to exit Six Flags Drive and continue on the northbound frontage road to Lamar Boulevard.
- PERMANENT The SH 360 northbound exit to Brown Boulevard/Ave K is PERMANENTLY CLOSED to construct a new entrance ramp between Ave J and Brown Boulevard/Ave K. Traffic will be directed to exit Six Flags Drive and continue on the SH 360 northbound frontage road to Brown Boulevard/Ave K.
- PERMANENT on April 28: The temporary SH 360 Southbound entrance from Six Flags Drive was permanently removed from service. Traffic is directed to the next entrance from SH 180/Division Street.
- Effective July 17, 2023: The SH 360 northbound exit to I-30/Six Flags Dr was closed for construction of northbound direct connectors. Traffic is directed to exit SH 180/Division St/Randol Mill Rd and continue on the SH 360 northbound frontage road.
- Effective Jan. 6, 2021: The SH 360 northbound exit to I-30/Six Flags Dr/Lamar Blvd/Ave J was moved to a new, temporary exit ramp.
- Effective, Jul 17, 2023: The SH 360 northbound exit to I-30/Six Flags Dr/Lamar Blvd/Ave J is closed . This is a permanent closure. Six Flags Dr traffic is directed to exit for SH 180/Division St/Randol Mill Rd/Six Flags Dr.
SH 360 Southbound Frontage Road
SH 360 South-to-North U-turn at Lamar Boulevard
- The SH 360 south-to-north U-turn at Lamar Boulevard will be closed while the SH 360 mainlanes and northbound frontage road are under construction.
- The SH 360 south-to-north U-turn at Six Flags Drive will be closed while the SH 360 mainlanes and northbound frontage road are under construction.
Six Flags Dr to Lamar Blvd
- Nightly, Aug 29-31, and Sep 5, 8p-5a: The SH 360 northbound frontage road between Six Flags Dr and Lamar Blvd will be closed for bridge construction. Traffic will be detoured east on Six Flags Dr, then west on Lamar Blvd to return to the SH 360 northbound frontage road.
- Daily, June 1-Aug. 31, 8:30 a.m. - 4 p.m.: The right, outside lane of the SH 360 northbound frontage road will be closed between Lamar Blvd and Brown Blvd/Ave K for utility work.
- The SH 360 north-to-south U-turn at Six Flags Drive will be closed while the SH 360 mainlanes and northbound frontage road are under construction.
Six Flags Drive
- Nightly, Aug 29-31, and Sep 5, 8p-5a: Eastbound Six Flags Dr will be closed under SH 360 and westbound Six Flags Dr will be closed between I-30 and SH 360 for bridge construction. Eastbound Six Flags Dr traffic will detour on the SH 360 southbound frontage road to Randol Mill Rd, cross under SH 360, and return on the SH 360 northbound frontage road to Six Flags Dr. Westbound Six Flags Dr will be detoured north on Six Flags Dr, then west on Lamar Blvd to the SH 360 southbound frontage road to return to Six Flags Dr. EXPECT DELAYS.
- Effective May 23, 2023: Eastbound and westbound Six Flags Drive are reduced to one lane each direction between Copeland Road and I-30. EXPECT DELAYS. WATCH FOR NEW TRAFFIC PATTERN.
- PERMANENT: Copeland Road between Six Flags Drive and the SH 360 southbound frontage is closed.
- PERMANENT: Westbound Copeland Road from Six Flags Drive to just east of Ballpark Way is permanently closed. Only eastbound Copeland Road traffic will be allowed between Ballpark Way and Six Flags Drive.
- PERMANENT: The I-30 eastbound entrance ramp available from this intersection was removed permanently from service. Access to northbound Ballpark Way is maintained.
- PERMANENT: 105th Street between Six Flags Drive and Avenue E is permanently closed and will be removed.