Mayor Jim Ross | City of Arlington Texas website
Mayor Jim Ross | City of Arlington Texas website
Want to stay in the know about the Texas Department of Transportation's Southeast Connector Project and how construction activity may affect your commute? Each Friday, the City of Arlington will share the latest information about the $2.1 billion project, which will rebuild and widen approximately 11 miles of I-20, I-820 and US 287 between now and 2027.
Residents can also add their contact information on the Southeast Connector Project website to receive updates directly via text or email.
When complete, the Southeast Connector Project will tie in the east and southeast part of Tarrant County to the central part of the county while relieving congestion, increasing safety and improving efficiency for the entire Metroplex.
Closures listed below are subject to changes due to weather and schedule. For more information, project photos and a full list of detours and closures, please visit the Southeast Connector Project website. Residents can also contact info@southeastconnector.com or call 844-820-2870.
Please note: Speed limits are now reduced to 55 mph within the entire corridor.
Main Lanes
Westbound I-20 at US 287
- 11 p.m. March 6 to 6 a.m. March 7: Westbound I-20 closed at US 287. Traffic will detour to U-turn at Sublett Road.
- 11 p.m. March 7 to 6 a.m. March 8: Eastbound I-20 closed at US 287. Traffic will detour to U-turn at Sublett Road.
- 11 p.m. March 7 to 6 a.m. March 8: Eastbound I-20 entrance ramp closed from Business 287. Traffic will detour to Green Oaks Boulevard.
- 11 p.m. March 8 to 6 a.m. March 9: Westbound I-20 interchange ramp closed to Southbound US 287. Traffic will detour to frontage road U-turn.
- Through March 8: Northbound I-820 reduced to one lane between Berry Street and Rosedale Street.
- Through March 4: Southbound I-820 reduced to one lane between Ramey Avenue and Wilbarger St.
- 11 p.m. to 6 a.m. Feb. 29 through March 9: Northbound US 287 reduced to one lane at Eden Road
- 9 p.m. to 6 a.m. through Mar. 11: Southbound US 287 reduced to one lane at Village Creek Road.
- Through March 8: Southbound I-820 reduced to one lane of through traffic between East Berry Street and Wilbarger Street.
- 9 p.m. to 6 a.m. through March 9:Northbound US 287 reduced to one lane between Martin St. and Village Creek Road.
- 11 p.m. to 6 a.m. through Apr. 30: Southbound US 287 reduced to one lane between I-20 and Little Road.
- 9 p.m. to 6 a.m. through Mar. 2: Southbound I-820 reduced to one lane at US 287 interchange.
- 11 p.m. to 6 a.m. through Mar. 2: Left lane closed on westbound I-20 before I-820.
- 11 p.m. to 6 a.m. through Mar. 2: Southbound I-820 reduced to two lanes at Sun Valley Drive.
- Nightly, 9 p.m. to 6 a.m. through Feb. 26: Right lane of southbound US 287 closed at Sublett Road.
- Through Feb. 24: I-820 northbound reduced to one lane between US 287 and Berry Street.
- 9 p.m. to 6 a.m. through Feb. 24: Eastbound I-20 reduced to one lane between Wichita Street and Business 287.
- 9 p.m. to 6 a.m. through Mar. 8: Northbound I-820 reduced to one lane between Craig Street and Meadowbrook Drive.
- 9 p.m. to 6 a.m. through Mar. 2: Southbound I-820 reduced to one lane at Meadowbrook Drive.
The City of Arlington has partnered with Waze to give drivers the best experience possible to get around town. Drivers can download Waze for free at www.waze.com/get for iOS and Android and see real-time traffic, find optimal routes, avoid road closures and more.
Original source can be found here.